Interior design commission contract

Interior design commission contract

(for reference only)

The client (Party A):

The undertaker (Party B):


Instructions for use

1. The text of this contract is an exemplary text formulated in accordance with the "Contract Law of the People's Republic of China", the "Regulations on the Supervision of Contract Forms of Shanghai Municipality" and relevant laws and regulations, which are agreed upon by both parties and should be read carefully before signing a contract.

Second, the scope of this contract: residential decoration design and public space interior design.

Third, Party B provides Party A with plans and materials, and binds them according to the catalogue.

4. Special requirements and fire safety requirements must be designed according to special requirements and fire safety requirements. Environmental protection materials must be considered when designing.

V. The design drawings provided by Party B to Party A are:

1. Drawings cover, back cover, design drawings;

2. Design drawings directory and design and construction instructions;

3. The original room type plane measurement chart (including all wall internal dimensions, door and window hole size, room beam, Sheung Shui, gas, water, floor drain, pit tube, air conditioning hole, exhaust outlet, distribution box, weak box, multimedia labeling );

4. Design requirements for demolition of floor plans (demolition of load-bearing structures shall be subject to written approval from the A-property or related department);

5. Design floor plan;

6. Design the top layout;

7. Strong, weak and multimedia, intelligent socket location map;

8. switch control circuit schematic;

9. Schematic diagram of the discharge direction of cold and hot water pipes;

10. Arrangement drawings for kitchen and bathroom wall facilities (other considerations for medium and small projects);

11. Furniture, kitchen utensils design layout reference map;

12. stair design, installation and construction details;

13. Partial perspective (as a reference);

14. The main decoration materials supplies budgetary statement.

Shanghai Interior Design Contract

Contract No:

The client (Party A):

The undertaker (Party B):

According to the "Chinese Republic of Republic Contract Law" and other relevant laws and regulations, combined with the characteristics of interior decoration, and through friendly negotiations between Party A and Party B, Party A entrusted Party B to undertake interior decoration design, and reached the following agreement (including the attachment of this contract and All supplemental contracts) for mutual compliance.

1. Party A entrusts Party B to assume the interior design according to the following scheme;

1. Party A commissions Party B should undertake residential interior design, address, room type, purpose, construction area of ​​square meters. The design fee is based on the area of ​​use.

2. Party A Party B commissioned commitment to public space interior design, address, purpose, construction area of ​​square meters. The design fee is based on the floor area.

2. Party A entrusts Party B to undertake the interior design. The design fee is RMB 1 per square meter, and the design fee is RMB 2,000.

3. Party A shall pay 50% of the design fee for the first time on the date of signing the contract, and agree with Party B on the time and place of the on-site measurement. Party B completes the preliminary design plan within days of measurement.

4. After Party A and Party B reach an agreement through the communication on the deepening design scheme (drawings) completed by Party B, fill in the schedule of the scheme (see attachment) and sign and confirm by both parties. Party A shall pay the balance of the design fee, and Party B shall complete a full set of decorative design drawings and construction drawings on a total of between 1 January and 2 January.

5. The design fee paid by Party A does not include the structural design of the main body of the building. If Party A needs to change the building main body and increase the load on the house, Party A must issue a construction plan from the original design unit or a design unit with a corresponding qualification level, and submit it to the property and related departments for written approval before proceeding with the interior decoration design.

6. After completion of the complete set of drawings, Party A shall communicate with Party B if there are any changes. According to the negotiation plan, Party B draws the revised drawings and fills out the schedule of the program again, signed and confirmed by both parties. If Party A requests Party B to modify the drawings, the completion date of the drawings shall be extended or otherwise agreed by both parties.

If Party A overturns the original design plan and requires the redesign of the design plan, it shall negotiate to increase the corresponding design fee, and separately stipulate the design time and progress, and sign a supplementary agreement.

7. After the two parties confirm the design plan and drawings, Party A must sign the approval to prevent it from having to hand over the complete set of drawings to Party A and apply for visa processing.

VIII. During the construction process, Party B should appoint designers

1. At least one design before the start of work;

2. Solve the technical problems related to the design The on-site service is at least twice;

3, the program completed acceptance at least once;

4. The designer provides services accompanied by the selection of furniture and soft furnishings at least once.

Nine, breach of contract responsibility:

1. Due to Party B's reasons, Party B did not complete the design drawing within the agreed time frame and the extension time was within 20 days. A penalty of 3% of the total design price of Party A should be paid for each delay day.

2. Party B terminates the contract without reason, and in addition to refunding the design fee paid by Party A, it shall also pay the breach penalty of 50% of the total design price of Party A.

3. After Party B completes the preliminary design plan, if Party A is unwilling to perform the contract again, Party B will not refund the received design fee, but it must be submitted to Party A's preliminary design plan.

X. If there are any unfinished matters in this contract, which can be resolved through consultation between the parties, it may also apply to the Shanghai Interior Decoration Industry Association for mediation or to the Shanghai Municipal Consumer Rights Protection Committee for complaints. If the parties are unwilling to resolve through consultation or mediation, or if consultation or mediation fails, they can adopt the following methods:

(1) Apply to Shanghai Arbitration Commission for arbitration.

(2) Filed a lawsuit in the People's Court.

XI. This contract is made in two copies and each party holds one. This contract includes the attachment of the contract and the supplementary agreement. It will take effect after the signature or seal of both parties.

XII. The parties agree on the following additional provisions:

1.

2.

3.

Party A (seal): Party B (seal):

Address: Address:

Tel: Tel:

Year Month Day Year Month Day

Design plan process table