The key points and two technical difficulties of the installation of Henan sliding contact line

Slip line, its preparation before installation, and confirmation of system layout, in addition, some technical points and difficulties in the installation process, these are related to the installation of the slip line, and it is also necessary for this work Prepared theoretical knowledge. Therefore, let's take some time to give a detailed explanation.
1. Preparation before installation of sliding contact line
The sliding contact wire, which is to be prepared before installation, to be specific, mainly includes the following, for:
(1) The related mobile devices, tracks, etc. have been installed and have no problems after inspection.
(2) For the power supply in and out cables, as well as the outgoing cables of mobile devices, all have been laid in place.
(3) After checking and confirming the input and the interface requirements of the current collector, there are no problems or concerns.
(4) At the installation site, there is a working platform that can be used normally, and related technical and operating personnel. In addition, the construction materials and equipment used are all in place.
2. Confirmation of the system arrangement in the contact line
For this, it mainly involves five, specifically for the system as a whole, expansion components, fixing clips, power input unit and maintenance unit. And these five parts are indispensable. In terms of its content, it mainly involves the quantity and location. For the system as a whole, it is generally arranged horizontally.
3. Some technical points and difficulties in the installation process of sliding contact line
Technical points and difficulties: Generally speaking, the centerline of the sliding contact line is parallel to the trajectory of the device. However, in practice, there may be a deviation phenomenon, making the two not parallel. Therefore, in this case, there is no need for straightness, but to choose an efficient operation method to carry out.
Technical Points and Difficulties 2: If the angle steel bracket cannot be installed according to the standard spacing, the installer should pay attention to whether the spacing between the joint sheath and the angle steel bracket can meet the safety requirements of free expansion. If it is not satisfied, then it is necessary to take some measures to make adjustments so that it can meet the requirements.

corn wet milling process, after germ gluten, starch are separated, the fiber is separated out, dosed with some corn slurry, then dried through revolving barrel contacting methed.It contains starch, cellulose and other oligossachride, meanwhile it have rich dissolvable protein and its degradable substance, such as peptide hormone, various amino acid and so on. Besides, it contains lactic acid, phytin salt, dissolving sugar, all these constitute a nutritional products.

It is good feed for phytophage livestock (cattle, sheep, and fish), also good for pig, chicken and other single stomach animals. 3-5% dosage in feed could provide the nutrition factors the animal need, but also promote the health of digesting system.

Corn Gluten Feed (CGF)

Corn Gluten Feed,Corn Gluten Feed For Pig Feed,Cgf 18 For Pig Feed,Con Gluten Feed 18

MIDI FEED BIOTECH LIMITED , https://www.chinabromine.com

This entry was posted in on